Saturday, November 3, 2012
Our House is a Very, Very, Very Fine House
Hello Everyone, and Greetings From New Orleans,
Ann and I are here in NOLA finishing up our 18th trip. After spending 4 weeks working here in New Orleans with Rebuilding Together on a handful of homes for their annual October Build effort, we headed over to Biloxi, Mississippi last Sunday to join our compatriots from Kaiser Permanente. Kaiser comes to the Gulf South twice each year to continue their efforts to help the region recover from Hurricane Katrina, spending one week in New Orleans and one week in Biloxi.
Biloxi, while a lot smaller than New Orleans, was severely damaged by a huge storm surge that directly hit them. The city is situated on the shores of the Gulf of Mexico, and US 90, the highway running directly along the beach, used to be home to scores of antebellum homes that enjoyed spectacular views of the Gulf. The storm surge not only wiped out many of those structures, it continued onshore for dozens of blocks, instantly wiping out homes far from the beach. Biloxi's damage was much like what the Lower Ninth experienced here in New Orleans--instant, total destruction.
Just a few weeks before Katrina hit, the family we were working for had just moved into a home over one-half mile inland. The home was tossed off its foundation in an instant, broken in two, and deposited on the neighbor's property. Our single-mother's daughter was 6 years old at the time, and suffered tremendously in the emotional aftermath of the storm. She was convinced she would never be safe in her home again, if she ever had her own home again. Like thousands of kids in New Orleans, thunderstorms brought back terrifying fears of death and loss and lack of control. We were building a completely new home for them, now 9 feet in the air to meet the post-Katrina building codes, on that same property.
Kaiser's team bet the farm this time, choosing to participate in their first Blitz Build, where the goal is to build an entire home in one week. They not only brought 30 volunteers, they also purchased the building materials for the home. A major investment by John Edmiston and his people, as usual.
This project came to us through the Moore Community Center, a Methodist-operated project that provides child care and other services to families in need in Biloxi. Awhile back, the good people at Moore realized that a lot of the moms they were providing child care services for would benefit from training opportunities that would lift them economically. They began the Women in Construction program, which provides free training in the construction trades to 10 or so women at a time. This project was anchored by them, and we were honored to work alongside these super-determined people throughout the week.
The majority of our volunteers come with very little construction experience, and are propelled instead by the size of their hearts and their determination to achieve whatever goals are set out for them. In the process, everyone gains skills and confidence in abilities they did not have at the beginning. Ann and I are familiar with Blitz Builds, made famous by Habitat for Humanity, but we've never participated in one. She and I and most of our Kaiser volunteers approached this week with cheerful optimism, propped up by this romantic exciting notion that this week would be magic and made-for-TV-movie-like. You know--a challenge here or there, a hangnail and a bruise for a few of us, but then, right before the credits roll, the home is somehow finished, with plenty of time to spare for showers, meals, drinks and laughs in between.
Yeah--just like that. Uh huh. It turns out that some editing takes place before that one hour show airs. Our week included the footage that never makes it to air.
Pollyanna was a no-show on Monday morning. We were scheduled to roll at 6:30 am, met quickly with our lead contractor at 6:45, started work at 7 am, and worked like whipped dogs until 7 pm.
The pros erected the 9-foot raised foundation prior to our arrival, and our work began with that and the floor in place, with a large inventory of lumber right next to it. We immediately split into several teams. One team climbed ladders onto the deck to frame the house, one team set about to paint all of the exterior trim and siding prior to installation, and Ann and I were asked to lead teams assigned to build the front and back stairs and porches. We were also asked to get them completely finished in one day, two days max. One minute after we'd met our bosses and been given our assignment, I felt a bit like I was in that recurring dream where I show up at my college final exam and realize I had never read the textbook or even attended the class.
The butterflies dissipated pretty quickly though, as the urgency set in and it became clear that it was indeed up to our team to build those porches and stairs, and to do it quickly and correctly. We split up, and Ann assembled a team to teach them how to cut stair stringers that fit while she simultaneously tried to figure out just where the posts that would hold up the switchback porch, steps and the upper landing were supposed to go so the holes could be dug and the posts could be set. My team had the easy job of the two, needing only to get going building two decks.
I felt a little bit bad that I got assigned to the deck team and Ann got the stair responsibility. I can't do stairs, and Ann does them beautifully. Stairs are much more work than decks, and I don't have the confidence that I could make them happen, and I was guiltily grateful that Ann had the job instead of me.
Reality began to set in for all of us as Monday turned dark. During the day, the framing team got all of the exterior walls and most of the interior walls up. Painting proceeded apace, despite the lack of real estate to stage painted boards while they dried. Ann trained two women to mark and cut stair stingers, and their work was impeccable. The porch deck team erected the frame of the back porch, and cut the joists. But, despite our sucker's notion that it wouldn't get dark before we decided it should, it did indeed get dark, the mosquitoes got mean, and at 7pm it was time to go. We trudged home, buoyed up by the shape of an actual home, held down by the weight of tasks unaccomplished, and now tempered by the reality that this is how the week was going to go.
On Tuesday, our goals were to finish the framing, install the roof trusses, sheet the roof in preparation for shingles, finish the front and back porches, finish the back stairs and prepare the front for stairs, and complete the painting. We did part of that, and then, go figure, it got dark again. Ann assembled a small team to stay late to site and dig the final holes for the posts that would hold up the back steps, and pour the concrete so those final posts would be ready by morning. Ann's team left for home at 8:30 that evening, and it occurred to us then that, by God, we were going to get our work done come hell or high water. Joaquin, John, Ann, and I left dead tired, but happily agreed on that fact.
Pizza, beers, a quick shower at 11 pm, then crash to bed and up again at 5 am. When we got to the work site on Wednesday morning, Ann's team kicked ass and those two extra hours we spent the night before paid big dividends, as her team quickly erected the switchback platform, installed the stair stringers, and bam! The back stairs were up. It was a moment for the entire group not unlike when the rest of us watched the framing team tilt up the walls on Monday. The day went like that--the porch team finished the back porch and installed the rail, the truss team got the roof trusses completed and began sheeting the roof, windows were installed, and at the end of the day the place looked like a house. We moved to the front to knock out the front porch, and got it all framed and ready to deck. Now it felt to us emotionally like we were really rolling. You could feel the momentum building as our collective confidence lifted us. By now, rookies were veterans, and the teams had subdivided into sub-teams, with new leaders taking on tasks that freed the other leaders to look forward and figure out how to move the big picture ahead. Wednesday ended with a shrimp boil and beers on the beach near our bunkhouse, hosted by our homeowner and her family and friends.
On Thursday, we rocked. We got all of the posts for the front stairs dug and poured and set, we finished the front porch and got the rail going, the siding was being installed at a furious clip, and the roof sheeting was completed. After darkness fell, we rushed back for a quick shower and a night out together. Only the adrenaline and our shared satisfaction about our progress fueled us that night, but we set off to finally be together for some eating and drinking and laughing that set the table for our final day on site.
On Friday, everyone decided to leave for work early so as to get started as soon as possible. We rolled at 5:30 or so, and set up our tools, power, and air in the dark. At the first sign of light, everyone dove in. Ann's team and my team came together to make use of our new skills to wrap up our projects. Joaquin, Katherine, Rosemary, Christine, Jackie, Michelle, Tanya, Susan and others all meshed so well that by then we knew each others' moves and needs that we were handing tools back and forth before they were requested. Sue Giboney, our longtime pal from the first project we worked on with Kaiser volunteers, and now a valuable team leader, joined us on Friday after completing her framing work, and she and Jackie Jones, our other longtime team leader and pal, led the rail team far beyond where they thought they could go. The rails on the back were completely finished, and the front rails were as complete as they could be considering I couldn't finish installing the posts in the time allotted. In addition, the front stairs were framed, the switchback was erected, and the stair treads were being installed. The roof team completed half of the shingles. The siding was completed, and the doors were installed. Insulation was installed inside. At night during the week, professional plumbers and electricians did their work after we left. At 4:30 on Friday afternoon, we stopped for a ceremony to present the home to Jana and her daughter Mia, and to collectively celebrate our accomplishment. Two seconds after the ceremony, everyone rushed back to their work stations to continue, trying to beat sunset. At the end of the day, that empty, bare floor deck we woke up to on Monday morning had been replaced by an honest-to-God home. It wasn't ready to move into, but the table is not only set, the meal has been served, and dessert is on its way. And our Women in Construction compatriots will see it through.
And just like that, it was over. 62 hours of work, sun-up to sundown, 5 days, see-through coffee and powdered eggs, showers at 10 pm, reveille at 5 am. At the end, we'd done 5 weeks of normal construction work. And we wished we'd been able to do more.
Wednesday, May 9, 2012
Take These Broken Wings and Learn to Fly
Hello Everyone, and Greetings from New Orleans,
Ann and I have made two trips to New Orleans since we last wrote you in April of 2011. We spent February here to celebrate and enjoy Mardi Gras with our pals down here, and then went to work immediately after that with Rebuilding Together New Orleans to work on Miss Ruby's home in a far corner of the Hollygrove neighborhood. Hollygrove is a section of New Orleans immediately east of the 17th Street Canal, and many homes took lots of water from the storm surge that stormed up the canal from Lake Ponchartrain. We helped install siding on her home, and made it ready for paint to be applied by a Spring Break group of college students who arrived right after we left.
Ann went home a few days before I did, and Kelsey was able to make it after that for her third trip to volunteer. Kelsey was a pro from the beginning, gutting a large home with me on her first trip in March of 2007. Kelsey and I got to prepare a large home on Gravier Street for exterior paint, supplied the following week by Spring Break college kids. We also discovered the joys of a shrimp po' boy at the Coye Food Store in the heart of the bleakest section of the Hollygrove. It felt good to do business with a local business in an area that still needs so much help. The woman who ran the kitchen in the back of the store made a mean sandwich for us, and we've returned a few times since.
Ann and I spent most of March in Olympia without unpacking. I flew back to NOLA on April 5th, and Ann joined me on the 10th. We joined up with Rebuilding Together New Orleans right away and worked on a few homes in the final stages of rebuilding. It has been a great pleasure for us to work on projects that are nearly finished. When we come to NOLA to work, we get plugged into whatever is going on at the time. This trip, we were able to work on homes that were nearly finished. That is a guilty pleasure. To be able to punch-list a home is a privilege we aren't often given, and it's a rare treat to back out of a home for the last time to make way for a homeowner to return.
Chinese Drywall
The first home Ann and I worked on was one of Rebuilding Together's 51 Chinese Drywall homes. After Katrina, the Southeast Region ran short of most building supplies, including drywall. To meet the huge demand that couldn't be met in time with American-made drywall, suppliers imported tons of Chinese-made drywall, and for-profit and not-for-profit organizations alike purchased and installed it. Rebuilding Together alone used it in 51 of their rebuilds. The product turned out to be tainted with contaminants that off-gassed toxic fumes, corroding copper wiring and plumbing, ruining electronic components like TVs and microwaves, and making residents sick, driving them from their rebuilt homes. After the storm, after insurance companies ignored claims, after two years in a FEMA trailer, after finding organizations like Rebuilding Together to come and help, after moving back into a newly-restored home, after all of that--they were forced to vacate their home so it could be gutted completely again, and rebuilt completely again. Each rebuild takes several months to complete.What else could happen to these folks?
Rebuilding Together, Habitat for Humanity, Operation Helping Hands, and other organizations all chose to do the only thing they felt they could do--they committed to rebuilding each and every home at their expense. Doing so took down Operation Helping Hands, who, following the remediation work, shut down, exhausted and broke. Rebuilding Together estimates the cost of each rebuild to exceed $40,000.
One of the Chinese drywall manufacturers, Knauf Plasterboard Tianjin, has entered into a settlement that will provide some assistance to homeowners who can prove their product was used. Other Chinese manufacturers, because they are not subject to US jurisdiction, have simply ignored the lawsuits. Makes you wonder about the benefits of globalization, doesn't it? I mean, if foreign manufacturers are entitled by treaty and law to sell their products in our market, where is the reciprocity if their products cause us harm?
Our Work
We spent a bunch of time at Miss Audrey's home on Spruce Street in the Hollygrove. Miss Audrey's son suffered a massive stroke, and is now confined to a motorized wheelchair. Ann and I had one of those "Aha!" moments at her home when the work was described for us. Miss Audrey's home is a solid single shotgun home, in pretty good shape, but when a wheelchair is added to the equation, the level of the floors becomes very apparent. Between the back bedroom, where Miss Audrey's son lives, is a bathroom/laundry room that he has to pass through to make it out the side door to his wheelchair ramp. That room was the place where all of the imperfections of the floors came together. The foundation had sagged, and her son could no longer traverse the floors with his wheelchair without Miss Audrey's help. Miss Audrey is several sizes smaller, and a number of years older than her son..
Our Rebuilding Together's boss' plan was to build a small ramp to get Miss Audrey's son from his bedroom to the bathroom/laundry room level (several abrupt inches below his bedroom). While we took a small break Ann and I were sitting on the floor and it came to us: the span from the edge of the bedroom level to just a few feet inside the bathroom level, WAS LEVEL. In other words, right there at the transition was a foundation sag that had added the drop between the rooms. Instead of building a ramp that acknowledged the sag, if we pulled up just a few square feet of floor, fixed the joists underneath, then installed new subfloor and tiles, voila! We'd have a level floor he could pass through on his own, without Miss Audrey's assistance. After proving our discovery, we all went to work on what turned out to be a really great solution, leaving all of us pleased with the outcome. Several times, Miss Audrey showed us her love with her wonderful lunches. Lunches we've been served so often during our time down here in New Orleans, lunches we've long referred to as Sunday Dinner.
Subscribe to:
Posts (Atom)